- Clean the installation location: Since the operating table is not easy to move after installation, the installation location needs to be thoroughly cleaned and inspected before installation to ensure that it is clean, flat and meets the size requirements for equipment installation.
2. Confirm the load-bearing capacity: Before starting the installation, the load capacity of the installation location must be determined and arranged according to the drawings and the actual conditions on site.
3. Technical verification: Before the operating table enters the site, the installation conditions should be confirmed by the technicians, and only when the installation site is entered can the site be entered.
4. Classify and arrange the components in an orderly manner: After the operating table components enter the site, they should be classified and arranged according to type, installation sequence, weight, etc., and pay attention to leaving the personnel passage and protecting the site environment.
5. Accurate components: During the installation of the operating table, it should be noted that the connecting screws between the components should be tightened, the size should be accurate, and the horizontal and vertical degrees should be within the standard range.
6. Signal cable opening: When opening the entrance of the signal cable in the operating table, it is necessary to ensure that it is kept at a certain distance from the power cable opening, the size is equal to the quantity and model, and it must be bundled in an orderly manner.